◆ Design partner previewCompliance Vault — sample data, real contracts.
Schedule a DP conversation →Layout, contracts, and data shapes are real. The data shown is illustrative. Real customer data flows live with our first design partner.
Annex IV — fixture preview.
EU AI Act · Annex IV §1–§9
Vertical Model B (legal-summary)
mdl-vertical-B
mime: text/plainsize: 2153 bytesstatus: active
raw →◆ PDF backend pending (BE6 swap)Annex IV pack rendered as plain text. The real PDF templater lands when silver-annex-iv-v2's BE6 backend ships; the UI will branch on mime_type() and switch to embedded PDF preview without a contract change.
MOCK PDF — Annex IV §1–§9 placeholder
=====================================
NOTE: text-fixture mock. See `crates/silver-annex-iv-v2/MOCK.md`.
Model: fixture-vertical-model-B
Vertical: legal summarization (high-risk, Annex III §6 (law-enforcement))
Generated: 2026-05-04 (mock)
Spec ref: EU AI Act Art. 11 + Annex IV; Art. 26 (deployer obligations)
§1 — General description
------------------------
Vertical model "fixture-vertical-model-B" is a domain-specialised
fine-tune of fixture-foundation-model-A targeting legal-document
summarisation. Marketed to law-firm clients in EU jurisdictions.
Classified high-risk under Annex III §6.
§2 — Detailed description
-------------------------
§2(d) Datasheets: legal-summary fine-tune corpus declared in
`legal-summary-pii-leak.json`. Note: this fixture intentionally
contains a residual T6 PII-leak refutation surfaced via the
erasure-completeness check (see `/vault/erasure/<id>`).
§2(e) Validation/testing: ROUGE-L 0.41; human evaluation on 200 EU
case-law summaries; deployer-side calibration wizard in app.
§3 — Monitoring, functioning and control
----------------------------------------
Deployer-side prompt logging; PII-redaction wrapper; firm-level
access control.
§4 — Performance metrics
------------------------
ROUGE-L: 0.41
Hallucination rate (claim-level): 1.8%
PII-leak rate (post-redaction): < 0.01% (target); residual cases
flagged in incident replay ledger.
§5 — Risk-management system
---------------------------
Annex IV §5 + Art. 9 risk-management process; post-market monitoring
per Art. 72.
§6 — Lifecycle changelog
------------------------
2026-04-15 Fine-tune completed.
2026-04-30 Deployer rollout to 12 EU law firms.
§7 — Harmonised standards applied
---------------------------------
ISO/IEC 23894:2023; ISO/IEC 42001:2023.
§8 — Declaration of conformity
------------------------------
DoC reference: DOC-2026-MOCK-002.
§9 — Post-market monitoring plan
--------------------------------
Continuous incident replay; quarterly erasure-completeness re-prove
on the deployer's residual customer-data slices.
— END MOCK PDF —